Mechanical and electrical installation engineering and management acceptance criteria

Mechanical  and electrical installation project is the construction unit to apply,  the construction unit organize the construction units, design units,  supervision units to inspection, testing whether the sub-projects meet  the design requirements of industrial construction projects of equipment  can produce qualified products; civil construction projects can achieve system function properly, check acceptance, the formalities for handover.

First, the mechanical and electrical installation and acceptance criteria

Acceptance  criteria for mechanical and electrical installation works: You must  comply with the contract and the actual documentation requirements,  consistent with existing national acceptance of construction,  engineering completion, seamless term, the main process equipment,  facilities via linkage load debugging qualified, formed the ability to  produce or use function;  hand over the information to achieve complete filing requirements;  production preparation work needs to adapt production; environmental  protection, labor safety and health, fire protection facilities have  been built to use as required; few non-essential equipment, although not  according to the actual content of the provisions are completed, but  does not affect production ; commissioning of qualified equipment, so that the quality and  quantity of products to meet the design expectations in order to final  acceptance.

Second, the installation of mechanical and electrical engineering basis for acceptance

Mechanical  and electrical installation of the completion and acceptance of the  general authority: Feasibility study report; construction design and  design change notice; equipment specifications; current national  standards and specifications; relevant approval authorities or owners,  modify, adapt documents; EPC contract; construction and installation requirements and statistical  administrations on completion of the project requirements; projects  involving imported equipment or the introduction of foreign capital  should be prepared in accordance with the project completion report and  the World bank contract on time.

Third, the mechanical and electrical installation project completion settlement management

Mechanical  and electrical installation projects have been completed, and has been  the acceptance visa, hand over the information collated summary of  completed and by the responsible party signature recognition;  Construction Budget and should adjust the project cost has been  prepared; design changes and other technical approval such as single  visa has been finishing;  personnel due to the construction unit causes Wogong, idle equipment,  schedule delays and other economic claims have been approved by the  company after the renovation, the project to project to the Employer for  final project price settlement. The Employer and the Contractor in accordance with legally binding  works contracts and supplemental agreements signed, as well as national  authorities issued the relevant documents and standards were completed  in the accounts.

Completion  and acceptance of phase completion settlement report prepared by the  construction unit, the number of in-kind and monetary indicators for the  unit of measurement, comprehensive reflection of the completion of the  project from the beginning to the completion of the project to build the  delivery of all construction costs until use, construction achievements  and financial situation summary document. Collect and collate and analyze the basis of information to fill in completion settlement report.

In  summary, the mechanical and electrical installation works as a  construction project is an important part of people's lives and national  development are closely related. Improve the comfort, safety, efficiency, in fact, crucial to building mechanical and electrical installation. Mechanical  and electrical installation project management is a dynamic management  process, but also in the whole process of engineering materials,  equipment procurement, operations and special equipment, construction  machinery, technical archives, as well as a large number of returning  the warranty data and information need to be addressed, which requires setting up a computer system and database to achieve the level of project management continues to increase.